BMW G 650 GS /Sertao 2010-2016 Single Left GPR Exhaust Systems Trioval Muffler
BMW G 650 GS /Sertao 2010-2016 Single Left GPR Exhaust Systems Trioval Muffler

BMW G 650 GS /Sertao 2010-2016 Single Left GPR Exhaust Systems Trioval Muffler

Regular price
$329.00
Sale price
$329.00
Tax included.

Single Left side transformation kit.

Lightweight Tri-Oval silencer weighs only 2.0-2.4 Kg. Homologated road legal with removable db killer. 

Made in Italy from durable Aisi 304 Stainless Steel, using advanced TIG welding.

All mounting hardware included for a perfect fitment. Joints\ mid pipes included where applicable. No modification needed.

Manufacturer: GPR Italy

Designed and Dyno-tested in GPR's factory and hand made in Italy, using advanced TIG welding. Allows better gas outflow from the engine and increase in horsepower and acceleration. The GPR design proves successful in performance and sound. The kit is light weight and will shed off significant pounds of the bike. Includes a removable DB killer according with E3 regulations for sound and pollution. Includes Stainless Steel link pipe and hardware where needed. Comes with GPR's 2 years warranty. GPR has been making motorcycle exhaust in Milan-Italy for several decades with the spirit of MotoGP and SBK racing, using knowledge acquired thru racing research while sponsoring and supplying riders such as: Casey Stoner, Carlos Checa, Makoto Tamada, Alex Barros and more.

Designed and Dyno-tested in GPR's factory

GPR homologated exhausts that we sell come with a full 2 years warranty! *Please notice some may sell a non homologated racing version, it is cheaper and does not include a certificate or a db killer, it may cause trouble with police and regulation, as well as tuning issues.*

We are authorized distributors for GPR Exhaust since 2007 So we carry all available options for your bike! We also ride and race our selfs so we know bikes on road and on track.

International orders ship with Express courier, insured and tracked on-line. While we try keep a large variety of items ready on hand, a 14-24 days are needed for production.