BMW K1200GT 03-08 GPR Exhaust Systems Furore Black Slipon Muffler
BMW K1200GT 03-08 GPR Exhaust Systems Furore Black Slipon Muffler
BMW K1200GT 03-08 GPR Exhaust Systems Furore Black Slipon Muffler

BMW K1200GT 03-08 GPR Exhaust Systems Furore Black Slipon Muffler

Regular price
$443.00
Sale price
$443.00
Tax included.

BMW.19.FUNE

Lightweight Furore silencer weighs only 1.8 Kg. Homologated road legal with removable db killer. 

Made from Aluminum sleeve and special treated to a Black finish, with the unique Furore ergal cap.

All mounting hardware included for a perfect fitment. Joints\ mid pipes included where applicable. No modification needed.

Manufacturer: GPR Italy

Designed and Dyno-tested in GPR's factory and hand made in Italy, using advanced TIG welding. Allows better gas outflow from the engine and increase in horsepower and acceleration. The GPR design proves successful in performance and sound. The kit is lightweight and will shed off significant pounds of the bike. Includes a removable DB killer according to E3 regulations for sound and pollution. Includes Stainless Steel link pipe and hardware where needed. Comes with GPR's 2 years warranty. GPR has been making motorcycle exhaust in Milan-Italy for several decades with the spirit of MotoGP and SBK racing, using the knowledge acquired thru racing research while sponsoring and supplying riders such as: Casey Stoner, Carlos Checa, Makoto Tamada, Alex Barros and more.

Designed and Dyno-tested in GPR's factory

GPR homologated exhausts that we sell come with a full 2 years warranty! *Please notice some may sell a non homologated racing version, it is cheaper and does not include a certificate or a DB killer, it may cause trouble with police and regulation, as well as tuning issues.*

We are authorized distributors for GPR Exhaust since 2007 So we carry all available options for your bike! We also ride and race our selves so we know bikes on road and on track.

International orders ship with Express courier, insured and tracked online. While we try to keep a large variety of items ready on hand, 14-24 days are needed for production.